top of page

Phase 1 after receiving permits is demolition



Phase 2: Construction



Phase 3: Finishes. We had the stairs custom done and painted matte black.



We have the finished living room on the first floor, with built-in bookcases and exposed brick.


Master Bathroom with walk-in shower/ sauna. Full bath with large windows.
Master Bedroom with three large windows facing out toward the street. Grey wall with paneling, to give a luxury appearance.


A custom lit niche to keep shower needs. You can see the different tile we chose for the lit background .
Third floor shower with custom lit niche.


Full kitchen with all appliances.
Warm cozy finished basement and furnished for rental.


Full size basement bathroom
Single large bedroom with access to the back which is full of plants and places to sit.
Do you want to see more residential

bottom of page




